From “how much flooring do I need?” to a painting materials list or bathroom remodel budget—turn your measurements into quantities, costs and a practical work sequence.

$29.99 $9.99 Black Friday · one time

One-time purchase for one editable project. Materials and labor extra. Black Friday offer ends November 30, 2026 at 11:59 p.m. Eastern. No subscription. Separate from landlord plan offers.

Fictional flooring example

12 × 10 feet.
A plan that adds up.

Measured floor120 sq ft
With 10% waste132 sq ft
Coverage per box20 sq ft
Boxes to buy7 boxes

Rounded up to full boxes. Adjust waste and coverage for your selected flooring. Illustrative quantities, not a product recommendation.

Quantities from measurements

Flooring boxes, paint gallons and bathroom wall tile—with visible formulas and editable coverage.

Materials & work sequence

Add your materials, mark acquired items and organize the work from measuring through the final check.

Your complete budget

Enter prices, labor, delivery, permits, tax and contingency. Compare your estimate with your budget and record actual costs.

See what you get before checkout

One bedroom. A complete plan.

Review the full sample below or download it free. No signup or payment required.

The fictional project

Replace the flooring and repaint the walls of a 12 × 10 ft bedroom, with 8 ft walls and 32 sq ft of door and window openings. Ceiling painting is excluded.

Example budget: $1,500. Every price is illustrative. The planning fee is separate from project costs.

From measurements to shopping list

7 flooring boxes cover 140 sq ft, meeting the 132 sq ft requirement with waste.

2 gallons of finish paint cover two coats on 320 sq ft of walls at the entered coverage. Primer and supplies are listed separately.

Complete fictional sample plan

FICTIONAL SAMPLE - 12 x 10 bedroom flooring and paint

Combined project · 120 sq ft floor · 320 sq ft net walls

Estimated total$1257.25
Budget remaining$242.75
Unpriced items0

Quantities & materials

Flooring

7 boxs · $45.00 each

120 sq ft × 1.1 ÷ 20 sq ft/box, rounded up

$315.00
Finish paint

2 gallons · $38.00 each

320 sq ft × 2 coats ÷ 350 sq ft/gallon, rounded up

$76.00
Primer for prepared walls

1 gallon · $32.00 each

$32.00
Shoe molding, 16-foot lengths

3 pieces · $14.00 each

$42.00
Doorway transition

1 piece · $30.00 each

$30.00
Surface patch and sandpaper kit

1 kit · $18.00 each

$18.00
Roller, tray and brush kit

1 kit · $24.00 each

$24.00
Masking tape and protective covers

1 kit · $28.00 each

$28.00
Trim fasteners and paintable caulk

1 kit · $16.00 each

$16.00
Removal bags and disposal allowance

1 allowance · $40.00 each

$40.00

Budget breakdown

Priced materials$621.00
Material tax allowance$37.26
Labor allowance$400.00
Delivery allowance$35.00
Permit allowance$0.00
Contingency$163.99
Total estimate$1257.25
Actual costs entered (materials only)$0.00

Before you buy

  • Confirm room dimensions and subtract door/window openings once.
  • Obtain local supplier prices, product coverage and full box quantities.
  • Check delivery dates, return policies and access for materials.
  • Confirm permissions, permits and licensed-trade needs before work.
  • Check subfloor condition, moisture, underlayment, transitions and trim.
  • Confirm flooring layout, product acclimation and manufacturer waste guidance.
  • Check primer needs, surface repairs, tape, covers, rollers, brushes and cleanup supplies.
  • Use the paint label coverage for your surface; primer is a separate material.

Suggested work sequence

  1. Measure the space and record existing conditions.
  2. Set the scope, obtain quotes and confirm permissions or permits.
  3. Order materials and coordinate deliveries and trade availability.
  4. Protect retained items and arrange appropriate removal and disposal.
  5. Prepare and repair surfaces following the selected product instructions.
  6. Complete planned paint preparation, primer where needed and finish coats; allow specified drying time.
  7. Install flooring, transitions and trim in the sequence required by the manufacturer and scope.
  8. Install remaining fittings, inspect completed work and resolve punch-list items.
  9. Clean up, record actual costs and save receipts and warranty details.

Assumptions to verify

  • FICTIONAL SAMPLE: illustrative prices only, not a quote or a customer project. Room 12 x 10 x 8 ft; openings 32 sq ft; ceiling excluded. Waste 10%; flooring coverage 20 sq ft/box; paint 350 sq ft/gallon, two coats. Tax 6% of listed materials; contingency 15%. No actual costs recorded.
  • Rectangular room; feet and square feet. Automatic quantities do not model irregular room shapes; enter separately measured materials and verify them before purchase.
  • Quantities are estimates from your measurements, not a site survey. Verify product coverage, pattern waste, substrate and fit.
  • Budget uses your prices and allowances, not local quotes. Unpriced items are excluded, not free. Labor, permits and delivery need your estimates.
  • Planning worksheet only; not construction drawings, a contractor quote or code approval. Materials, labor and the plan purchase fee are separate.

Your notes

FICTIONAL EXAMPLE: all prices, allowances and conditions are illustrative, not supplier or contractor quotes. Scope: replace carpet with floating flooring and repaint bedroom walls. Room 12 x 10 ft, walls 8 ft high. One 3 x 7 ft doorway and one 11 sq ft window total 32 sq ft of openings. Ceiling, closet and adjacent rooms excluded. Floor: 120 sq ft plus 10% waste = 132 sq ft; seven 20 sq ft boxes provide 140 sq ft. Selected fictional flooring has an attached pad; separate underlayment is excluded, subject to product and subfloor requirements. Paint: 352 sq ft gross walls minus 32 sq ft openings = 320 sq ft; two coats cover 640 sq ft. At 350 sq ft/gallon, buy two gallons. One gallon of primer assumes at least 320 sq ft coverage for one coat. Trim paint is already on hand. Trim: 44 ft perimeter minus 3 ft doorway = 41 ft; three 16 ft lengths provide 48 ft before cuts. Verify lengths against layout. Existing subfloor is assumed dry, sound and level; no structural, plumbing or electrical changes. Tools are owned or borrowed. Add repair, rental or extra product costs if needed. Labor $400 and delivery $35 are placeholders to replace with quotes. Permit allowance is $0 only for this fictional scope; confirm local requirements. Tax is an illustrative 6% of listed materials and supplies only; taxable services and disposal treatment vary. Contingency is 15% of materials, tax and allowances. Planner purchase fee is separate. No materials have been purchased and no actual costs are entered. After purchase, your own plan lets you update measurements, prices and acquired items, save changes and export again.

Ready to plan your own project?

Your purchase unlocks one editable project with your measurements, material prices, checklist, budget and exports. This sample stays free to review.

Start my own project

All features. One purchase.

Start with your space.

Explore the complete free sample, enter your project details, pay once, then open your calculated plan. Save changes and download updated copies from your private link.

  • ✓ Flooring, painting and bathroom planning
  • ✓ Measurement-based material quantities
  • ✓ Editable materials checklist
  • ✓ Budget and actual-cost worksheet
  • ✓ Suggested work sequence
  • ✓ Downloadable PDF and budget CSV

Planning estimates only. Enter current supplier prices and confirm all measurements and product requirements. The planner does not include a site visit or contractor services.

1. Your measurements

Use feet for dimensions and square feet for areas. Automatic quantities use a rectangular room. For irregular spaces, enter separately measured material quantities in the checklist and confirm them before purchasing.

2. Product quantities & prices

Enter coverage from product labels. Blank prices stay marked “Price needed.” Default coverage and waste are editable assumptions.

3. Materials checklist

Add primer, trim, tools, fixtures, waterproofing, disposal and other items. Check off items acquired; actual cost is the total paid for that row.

4. Budget worksheet

Materials and labor are separate from the one-time planner fee. Confirm product requirements and qualified-trade work before construction.

Before you start

Can I see a complete plan before buying?

Yes. View the free fictional sample plan and download its PDF and CSV without signing up or paying. The sample shows quantities, materials, budget and the work sequence. Your purchase creates one editable plan from your own project details.

Is this a subscription?

No. One purchase unlocks one editable project, including all planning tools and PDF/CSV exports.

Are material prices included?

You enter current prices or contractor quotes. Blank prices remain marked as missing and are excluded from totals. The planner fee does not purchase materials or labor.

Does it work for bathroom remodeling?

Yes: plan floor and wall tile quantities, paint, fixtures and other materials, allowances and the work sequence. Trade work and code or permit requirements must be confirmed locally.

How long is the Black Friday price available?

$9.99 through November 30, 2026 at 11:59 p.m. Eastern; regular price $29.99. This price covers all planner features for one editable project.